The structure in the right background is for raising and lowering the intake gates to the penstocks. There is a long wooden handle attached to a rake on top of the intake screen for removing debris.
On the left hand side of the structure are two Yagi UHF aerials for remote monitoring. In the back centre can be seen the two low pressure concrete penstocks.